Second Baptist School - 6th Floor Labs
This new lab renovation is part of Second Baptist Schools Strategic Plan to enhance academic
excellence. The primary use of these labs is for engineering & physical science research,
advanced biological & chemical research, interdisciplinary problem solving within the lab. These
labs will also be used for medical research and procedure simulations, that can give students
who are interested in the medical field a chance to experience what the field has to offer.
Lab Furnishings Provided & Installed
Square Footage: 20,000
Completion Date: November 2024
Architect: Kirksey Architecture
General Contractor: Axis Builders
excellence. The primary use of these labs is for engineering & physical science research,
advanced biological & chemical research, interdisciplinary problem solving within the lab. These
labs will also be used for medical research and procedure simulations, that can give students
who are interested in the medical field a chance to experience what the field has to offer.
Lab Furnishings Provided & Installed
- Kewaunee Baskitbench Tables
- Kewaunee Venturi/Truview Fume Hoods
- Kewaunee Steel Casework
- Kewaunee Kemresin Work Tops
- Kewaunee Sinks & Accessories
- Watersaver Fixtures
Square Footage: 20,000
Completion Date: November 2024
Architect: Kirksey Architecture
General Contractor: Axis Builders